From initial assessment to solar-ready roof, we manage every aspect of the asbestos removal process with certified companies and full regulatory compliance.
Our services cover the entire asbestos removal process for solar installation preparation.
The first step is determining whether asbestos is present in your roof. We coordinate visual inspections and, when needed, laboratory testing to confirm material composition.
Spanish regulations require detailed work plans before asbestos removal begins. We prepare comprehensive documentation outlining safety measures, removal methods, and disposal procedures.
We work exclusively with companies registered in Spain's official RERA registry. This ensures all removal work is performed by properly certified and insured specialists.
Labor authorities must approve work plans before asbestos removal begins. We handle all required submissions, track approvals, and maintain compliance documentation.
During the removal phase, we oversee work to ensure adherence to approved plans, proper safety protocols, and correct handling of hazardous materials throughout the process.
Once asbestos is safely removed, we coordinate installation of your new roof. The result is a clean, compliant surface ready for solar panel mounting systems.
A structured approach that ensures nothing is overlooked.
We begin by evaluating your building and understanding your solar project timeline. This includes roof inspection, material identification, and preliminary assessment of removal requirements. If asbestos presence is uncertain, we coordinate laboratory testing to confirm material composition before proceeding.
Once asbestos is confirmed, we develop the detailed work plan required by Spanish regulations. This document outlines every aspect of the removal process, from safety measures to waste disposal methods. We also prepare all documentation needed for labor authority submissions.
We coordinate with certified RERA companies to obtain quotes and select appropriate contractors for your project. All companies we work with maintain proper certifications, insurance, and safety records. We manage contract negotiations and ensure clear terms.
Before any physical work begins, we submit the work plan to relevant labor authorities and track the approval process. We respond to any questions or requests for additional information, ensuring smooth regulatory progression.
During the removal phase, we coordinate with the RERA company to ensure work proceeds according to the approved plan. This includes monitoring safety protocols, tracking progress, and addressing any issues that arise during execution.
After safe removal and disposal of asbestos materials, we coordinate installation of your new roof. We verify that the completed roof meets structural and technical requirements for solar panel installation, creating a smooth transition to your renewable energy project.
Proper coordination ensures full compliance with Spanish asbestos regulations, protecting you from potential legal issues or project delays related to non-compliance.
Experienced coordination prevents common delays caused by incomplete documentation, regulatory misunderstandings, or communication gaps between multiple parties.
Working with certified RERA companies through professional coordination ensures proper safety protocols protect workers, building occupants, and the surrounding environment.
We maintain comprehensive documentation of the entire process, providing you with complete records that demonstrate compliance for future reference or solar installation permits.